KarachiCircularRailway CPEC CPEC making progress

Karachi Circular Railway project sees an advancement as model engine gets ready at carriage factory in Islamabad.

There will be 10 Locomotives and 40 couches which will accommodate 16000 people daily. Total journey duration will be 30 Minutes.

The KCR will operate along the 12-14 KM route
Route: Karachi Port Trust – Wazir Mansion – Lyari – Karachi University – Depot Hill

Related Post

The locomotive with 7 coaches for #Karachi Circular Railway is finally ready.
Coaches will be equipped with charging facilities, Wifi, TV, GPS system, Train stoppage information system and advanced washroom facility.

Disqus Comments Loading...
Leave a Comment